It is essential that the anchor bolts are accurately located prior to installation. There are there main types of installation:
1 New concrete with cast in anchors
2 Steel structures with bolted connections
3 Existing concrete with resin anchors
Whichever type of installation you have, an anchor bolt template will be the most accurate method of locating anchors either in groups or combination. A template should be requested at the time of order enquiry.
1.Preparation of fender
Prior to unloading of the fender components, it is advisable to prepare a suitable hard, flat surface to lay out the arch rubber fender. Arch rubber Fender can take up quite a large area and it is worth considering this beforehand to allow access for cranes and personnel.

2.Sling attachment for lifting
Depending upon whether arch fender is vertically or horizontally installed, it is not the easiest of items to lift.
The easiest method is to use a soft sling through the center which is adequately tensioned to avoid slipping during lifting

3.Lifting of fender
The first operation prior to lifting will be to lift the top end of arch fender and tilt it around a soft fabric type material. This should be situated along the bottom edge to prevent damage.
Once the arch fender is upright you can then lift it away and slue into position.

4.Fender attachment
Before attachment of the arch rubber fender, always ensure that adequate and safe access has been provide for all instances including inter tidal. Care should be taken when lifting the arch rubber fender into position to avoid damage to the rubber.

5.Complete installation
When the bolt holes have been aligned , it is advisable to loosely screw in each bolts using the carne to adjust fine movements. When all bolts are positioned, tighten them in sequence diametrically about the flanges.
